The Steelworkers of 110

Recovered from the saved listing page/13/index.html. The original standalone capture is unavailable; this may be an excerpt.

27.jpg

These photos are from heavy construction specialists the Francis A. Lee Company. They have done steel restoration work on the George Washington Bridge, and they built the new steel framing for the added floors at 110. In all they added 800 tons of steel to our building — but the pictures are more impressive than the number (click for high res).

01.jpg03.jpg

04.jpg05.jpg

Click through for more high-wire shots.

(more…)